This 1966 aerial photo shows the major, two-story addition of 1964-65 (section nearest camera -- the south side): That project added 19 classrooms, about 12 special-purpose rooms and offices,s and girls' locker and music facilities (the latter in the area at top right near the gym). The all-inclusive cost was $661,500 (bonds being sanctioned by voters in 1964 and 1965). The additions were ready by the fall of 1965. In 1971, a $75,000, three-room addition was constructed for Industrial Arts, "filling in" the area at top (north) between the "Cafetorium" and gym. [Photo by D. Arthur Knowles '59] |